20UPGPQ1101172
Quad-PCB/Prototype/EPEC-100um
  ITkPD Component Page Jump to ITkPD component page

Component Information

Item Value
Serial Number 20UPGPQ1101172
Production DB Component ID c9f4cd1147d319874e19131bc38557a5
LocalDB Component ID 63eba88eae50190036f5ba45
Component Type module_pcb
Super-Component 20UPGM22001172
Sub-Components No match.
Flags

Properties

Item Data Type Value
SMD population vendor string None
PCB Manufacturer string None
PCB design version codeTable None
PCB vendor technology codeTable None

Comments

Current Stage: Post-Parylene Cold

No tests are allocated for this stage.


Past QC Stages and Results

  Stage: Post-Parylene Warm (MODULE/POST_PARYLENE_WARM) Locally Signed Off

No tests are allocated for this stage.

  Stage: Parylene Unmasking (MODULE/PARYLENE_UNMASKING) Locally Signed Off

No tests are allocated for this stage.

  Stage: Parylene Coating (MODULE/PARYLENE_COATING) Locally Signed Off

No tests are allocated for this stage.

  Stage: Parylene Masking (MODULE/PARYLENE_MASKING) Locally Signed Off

No tests are allocated for this stage.

  Stage: Initial Cold (MODULE/INITIAL_COLD) Locally Signed Off

No tests are allocated for this stage.

  Stage: QC cross-check (module swapping) (MODULE/QC_CROSSCHECK) Locally Signed Off

No tests are allocated for this stage.

  Stage: Initial Warm (MODULE/INITIAL_WARM) Complete

No tests are allocated for this stage.

  Stage: Wire Bonding (MODULE/WIREBONDING) Complete

No tests are allocated for this stage.

  Stage: Bare module to module PCB assembly (MODULE/ASSEMBLY) Complete

No tests are allocated for this stage.

  Stage: Initial state to associate flex to bare module (MODULE/INIT) Not signed-off

No tests are allocated for this stage.

  Stage: PCB Reception at module site (PCB_RECEPTION_MODULE_SITE) Complete

Test Local Result ProdDB Record
Mass
(MASS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: PCB ready for module (PCB_READY_FOR_MODULE) Complete

No tests are allocated for this stage.

  Stage: Test failed, needs investigation (UNHAPPY) Complete

No tests are allocated for this stage.

  Stage: QC (PCB_QC) Complete

Test Local Result ProdDB Record
Dowel Tolerance Check
(DOWEL_TOLERANCE_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA post radiation cycle (QA_POST_RADIATION_CYCLE) Complete

Test Local Result ProdDB Record
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
SLDO and precision resistors
(SLDO_RESISTORS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA post radiation post thermal cycle QC (QA_POST_RADIATION_POST_THERMAL_CYCLE) Not signed-off

No tests are allocated for this stage.

  Stage: QA pre-radiation cycle (QA_PRE_RADIATION_CYCLE) Not signed-off

No tests are allocated for this stage.

  Stage: QA post-thermal cycle / thermal shock (QA_POST_THERMAL_CYCLE) Complete

Test Local Result ProdDB Record
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA pre-thermal cycle / thermal shock (QA_PRE_THERMAL_CYCLE) Complete

Test Local Result ProdDB Record
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
SLDO and precision resistors
(SLDO_RESISTORS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Cutting (PCB_CUTTING) Complete

Test Local Result ProdDB Record
Quick Tab Cutting Inspection
(QUICK_TAB_CUTTING_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Population (PCB_POPULATION) Complete

Test Local Result ProdDB Record
Component Position Check
(COMPONENT_POSITION_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: PCB being populated (PCB_BEING_POPULATED) Not signed-off

No tests are allocated for this stage.

  Stage: Reception (PCB_RECEPTION) Complete

Test Local Result ProdDB Record
Dowel Tolerance Check
(DOWEL_TOLERANCE_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Image capture test
(IMAGE_CAPTURE_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Layer thickness measurement
(LAYER_THICKNESS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Bare PCB Initial (PCB_INIT) Not signed-off

No tests are allocated for this stage.

Stage Tests
PCB_INIT
PCB_RECEPTION
  • Visual Inspection  (VISUAL_INSPECTION)
  • Metrology  (METROLOGY)
  • Dowel Tolerance Check  (DOWEL_TOLERANCE_CHECK)
  • Layer thickness measurement  (LAYER_THICKNESS)
  • Image capture test  (IMAGE_CAPTURE_TEST)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology Triplet Linear  (TRIPLET_PCB_LINEAR_METROLOGY)
  • Metrology Triplet Ring  (TRIPLET_PCB_RING_METROLOGY)
PCB_BEING_POPULATED
PCB_POPULATION
  • Visual Inspection  (VISUAL_INSPECTION)
  • Component Position Check  (COMPONENT_POSITION_CHECK)
PCB_CUTTING
  • Quick Tab Cutting Inspection  (QUICK_TAB_CUTTING_INSPECTION)
QA_PRE_THERMAL_CYCLE
  • SLDO and precision resistors   (SLDO_RESISTORS)
  • NTC Verification  (NTC_VERIFICATION)
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology  (METROLOGY)
  • LV and HV Test  (HV_LV_TEST)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
QA_POST_THERMAL_CYCLE
  • NTC Verification  (NTC_VERIFICATION)
  • Via resistance  (VIA_RESISTANCE)
  • LV and HV Test  (HV_LV_TEST)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
QA_PRE_RADIATION_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology  (METROLOGY)
  • SLDO and precision resistors   (SLDO_RESISTORS)
  • NTC Verification  (NTC_VERIFICATION)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
  • LV and HV Test  (HV_LV_TEST)
QA_POST_RADIATION_POST_THERMAL_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
QA_POST_RADIATION_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
PCB_QC
  • LV and HV Test  (HV_LV_TEST)
  • Dowel Tolerance Check  (DOWEL_TOLERANCE_CHECK)
  • Quick Tab Cutting Inspection  (QUICK_TAB_CUTTING_INSPECTION)
UNHAPPY
PCB_READY_FOR_MODULE
PCB_RECEPTION_MODULE_SITE
  • Visual Inspection  (VISUAL_INSPECTION)
  • Mass  (MASS)
  • Metrology  (METROLOGY)
  • Metrology Triplet Linear  (TRIPLET_PCB_LINEAR_METROLOGY)
  • Metrology Triplet Ring  (TRIPLET_PCB_RING_METROLOGY)
MODULE/INIT
MODULE/ASSEMBLY
MODULE/WIREBONDING
MODULE/INITIAL_WARM
MODULE/QC_CROSSCHECK
MODULE/INITIAL_COLD
MODULE/PARYLENE_MASKING
MODULE/PARYLENE_COATING
MODULE/PARYLENE_UNMASKING
MODULE/POST_PARYLENE_WARM
MODULE/POST_PARYLENE_COLD
MODULE/WIREBOND_PROTECTION
MODULE/THERMAL_CYCLES
MODULE/LONG_TERM_STABILITY_TEST
MODULE/FINAL_WARM
MODULE/FINAL_COLD
MODULE/FINAL_METROLOGY
MODULE/QC_STATUS
MODULE/UNHAPPY
MODULE/NOTCONSIDEREDINYIELDS
MODULE/COMPLETE
MODULE/RECEPTION
MODULE/TAB_CUTTING
OB_LOADED_MODULE_CELL/INIT
OB_LOADED_MODULE_CELL/ASSEMBLY
OB_LOADED_MODULE_CELL/THERMAL_CYCLES
COMPLETE
OB_LOADED_MODULE_CELL/FINAL_WARM
OB_LOADED_MODULE_CELL/FINAL_COLD
OB_LOADED_MODULE_CELL/THERMAL_COLD
OB_LOADED_MODULE_CELL/THERMAL_WARM
OB_LOADED_MODULE_CELL/ENVELOPE_CHECK
OB_LOADED_MODULE_CELL/QC_STATUS
OB_LOADED_MODULE_CELL/UNHAPPY
OB_LOADED_MODULE_CELL/COMPLETE
OB_LOADED_MODULE_CELL/RECEPTION
OB_LOADED_MODULE_CELL/TAB_CUTTING
OB_LOADED_MODULE_CELL/PIGTAIL_INSERTION
Back to top page of this component