20UPGPQ4610026
Quad-PCB/Outer Prod./Yamashita-Mat-75um
  ITkPD Component Page Jump to ITkPD component page

Component Information

Item Value
Serial Number 20UPGPQ4610026
Production DB Component ID dd3895cac196616c94017df1f0241607
LocalDB Component ID 66a2880cebdf60004362e6f0
Component Type module_pcb
Super-Component 20UPGM23610026
Sub-Components No match.
Flags

Properties

Item Data Type Value
PCB Manufacturer string Yamashita Material
PCB design version codeTable 4
PCB vendor technology codeTable 6
SMD population vendor string Hayashi REPIC Co.

Comments

Current Stage: Insertion of pigtail and strain relief glueing

No tests are allocated for this stage.


Past QC Stages and Results

  Stage: Module PCB tab cutting (in Combined Method) (OB_LOADED_MODULE_CELL/TAB_CUTTING) Alternative

No tests are allocated for this stage.

  Stage: Reception at Cell Integration Sites (OB_LOADED_MODULE_CELL/RECEPTION) Locally Signed Off

No tests are allocated for this stage.

  Stage: OB Loaded Module Cell Complete (OB_LOADED_MODULE_CELL/COMPLETE) Not signed-off

No tests are allocated for this stage.

  Stage: OB Loaded Module Cells failed test, needs investigation (OB_LOADED_MODULE_CELL/UNHAPPY) Complete

No tests are allocated for this stage.

  Stage: Grading of OB Loaded Module Cells (OB_LOADED_MODULE_CELL/QC_STATUS) Locally Signed Off

No tests are allocated for this stage.

  Stage: Envelope Check (OB_LOADED_MODULE_CELL/ENVELOPE_CHECK) Complete

No tests are allocated for this stage.

  Stage: Thermal Conductivity Test at Warm Temperature (OB_LOADED_MODULE_CELL/THERMAL_WARM) Not signed-off

No tests are allocated for this stage.

  Stage: Thermal Conductivity Test at Cold Temperature (OB_LOADED_MODULE_CELL/THERMAL_COLD) Not signed-off

No tests are allocated for this stage.

  Stage: Electrical Tests at Cold Temperature (OB_LOADED_MODULE_CELL/FINAL_COLD) Complete

No tests are allocated for this stage.

  Stage: Electrical Tests at Warm Temperature (OB_LOADED_MODULE_CELL/FINAL_WARM) Complete

No tests are allocated for this stage.

  Stage: Complete (COMPLETE) Locally Signed Off

No tests are allocated for this stage.

  Stage: Cold Cycle (OB_LOADED_MODULE_CELL/THERMAL_CYCLES) Complete

No tests are allocated for this stage.

  Stage: Module to cell assembly (OB_LOADED_MODULE_CELL/ASSEMBLY) Complete

No tests are allocated for this stage.

  Stage: Initial state to associate bare cell to module (OB_LOADED_MODULE_CELL/INIT) Locally Signed Off

No tests are allocated for this stage.

  Stage: Module PCB tab cutting (MODULE/TAB_CUTTING) Complete

No tests are allocated for this stage.

  Stage: Module reception (MODULE/RECEPTION) Complete

No tests are allocated for this stage.

  Stage: Module Complete (MODULE/COMPLETE) Complete

No tests are allocated for this stage.

  Stage: Stage for QA modules and others not to be considered in yield calculation (MODULE/NOTCONSIDEREDINYIELDS) Not signed-off

No tests are allocated for this stage.

  Stage: Modules failed test, needs investigation (MODULE/UNHAPPY) Complete

No tests are allocated for this stage.

  Stage: Ranking of the module (MODULE/QC_STATUS) Not signed-off

No tests are allocated for this stage.

  Stage: Final flatness measurement (MODULE/FINAL_METROLOGY) Not signed-off

No tests are allocated for this stage.

  Stage: Final Cold (MODULE/FINAL_COLD) Complete

No tests are allocated for this stage.

  Stage: Final Warm (MODULE/FINAL_WARM) Complete

No tests are allocated for this stage.

  Stage: Long Term Stability Test (MODULE/LONG_TERM_STABILITY_TEST) Complete

No tests are allocated for this stage.

  Stage: Thermal Cycles (MODULE/THERMAL_CYCLES) Complete

No tests are allocated for this stage.

  Stage: Wirebond Protection (alt) (MODULE/WIREBOND_PROTECTION) Complete

No tests are allocated for this stage.

  Stage: Post-Parylene Cold (MODULE/POST_PARYLENE_COLD) Complete

No tests are allocated for this stage.

  Stage: Post-Parylene Warm (MODULE/POST_PARYLENE_WARM) Complete

No tests are allocated for this stage.

  Stage: Parylene Unmasking (MODULE/PARYLENE_UNMASKING) Complete

No tests are allocated for this stage.

  Stage: Parylene Coating (MODULE/PARYLENE_COATING) Complete

No tests are allocated for this stage.

  Stage: Parylene Masking (MODULE/PARYLENE_MASKING) Complete

No tests are allocated for this stage.

  Stage: Initial Cold (MODULE/INITIAL_COLD) Locally Signed Off

No tests are allocated for this stage.

  Stage: QC cross-check (module swapping) (MODULE/QC_CROSSCHECK) Complete

No tests are allocated for this stage.

  Stage: Initial Warm (MODULE/INITIAL_WARM) Complete

No tests are allocated for this stage.

  Stage: Wire Bonding (MODULE/WIREBONDING) Locally Signed Off

No tests are allocated for this stage.

  Stage: Bare module to module PCB assembly (MODULE/ASSEMBLY) Complete

No tests are allocated for this stage.

  Stage: Initial state to associate flex to bare module (MODULE/INIT) Not signed-off

No tests are allocated for this stage.

  Stage: PCB Reception at module site (PCB_RECEPTION_MODULE_SITE) Complete

Test Local Result ProdDB Record
Mass
(MASS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Metrology Triplet Linear
(TRIPLET_PCB_LINEAR_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology Triplet Ring
(TRIPLET_PCB_RING_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: PCB ready for module (PCB_READY_FOR_MODULE) Complete

No tests are allocated for this stage.

  Stage: Test failed, needs investigation (UNHAPPY) Complete

No tests are allocated for this stage.

  Stage: QC (PCB_QC) Complete

Test Local Result ProdDB Record
Dowel Tolerance Check
(DOWEL_TOLERANCE_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
LV and HV Test
(HV_LV_TEST)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: QA post radiation cycle (QA_POST_RADIATION_CYCLE) Complete

Test Local Result ProdDB Record
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA post radiation post thermal cycle QC (QA_POST_RADIATION_POST_THERMAL_CYCLE) Complete

Test Local Result ProdDB Record
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA pre-radiation cycle (QA_PRE_RADIATION_CYCLE) Complete

Test Local Result ProdDB Record
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
SLDO and precision resistors
(SLDO_RESISTORS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Wirebond pull test
(WIREBOND_PULL_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA post-thermal cycle / thermal shock (QA_POST_THERMAL_CYCLE) Complete

Test Local Result ProdDB Record
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Wirebond pull test
(WIREBOND_PULL_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA pre-thermal cycle / thermal shock (QA_PRE_THERMAL_CYCLE) Complete

Test Local Result ProdDB Record
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
SLDO and precision resistors
(SLDO_RESISTORS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Wirebond pull test
(WIREBOND_PULL_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Cutting (PCB_CUTTING) Complete

Test Local Result ProdDB Record
Quick Tab Cutting Inspection
(QUICK_TAB_CUTTING_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Population (PCB_POPULATION) Complete

Test Local Result ProdDB Record
Component Position Check
(COMPONENT_POSITION_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: PCB being populated (PCB_BEING_POPULATED) Not signed-off

No tests are allocated for this stage.

  Stage: Reception (PCB_RECEPTION) Complete

Test Local Result ProdDB Record
Dowel Tolerance Check
(DOWEL_TOLERANCE_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Image capture test
(IMAGE_CAPTURE_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Layer thickness measurement
(LAYER_THICKNESS)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Metrology
(METROLOGY)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Metrology Triplet Linear
(TRIPLET_PCB_LINEAR_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology Triplet Ring
(TRIPLET_PCB_RING_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Bare PCB Initial (PCB_INIT) Not signed-off

No tests are allocated for this stage.

LocalDB Test ID Stage Test Name Inspector Date QC Registration
66a350bf6303b43c546a8c9c PCB_RECEPTION LAYER_THICKNESS YoichiIkegami 2024-10-06 23:45:53 PDT(-0700) Selected
66c2e8c7f94f575eb9fd9cd9 PCB_RECEPTION METROLOGY YoichiIkegami 2024-10-06 23:45:52 PDT(-0700) Selected
66a350986303b43c546a8c9a PCB_RECEPTION VISUAL_INSPECTION YoichiIkegami 2024-10-06 23:45:51 PDT(-0700) Selected
66f35ae4f29e45c7cb92d2b9 PCB_RECEPTION_MODULE_SITE METROLOGY KojiNakamura 2024-09-26 23:58:55 PDT(-0700) Selected
66f656fd62de602d4549a8e0 PCB_QC HV_LV_TEST KojiNakamura 2024-09-26 23:58:47 PDT(-0700) Selected
66f35abff29e45c7cb92d2b6 PCB_POPULATION VISUAL_INSPECTION KojiNakamura 2024-09-24 23:56:22 PDT(-0700) Selected
Stage Tests
PCB_INIT
PCB_RECEPTION
  • Visual Inspection  (VISUAL_INSPECTION)
  • Metrology  (METROLOGY)
  • Dowel Tolerance Check  (DOWEL_TOLERANCE_CHECK)
  • Layer thickness measurement  (LAYER_THICKNESS)
  • Image capture test  (IMAGE_CAPTURE_TEST)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology Triplet Linear  (TRIPLET_PCB_LINEAR_METROLOGY)
  • Metrology Triplet Ring  (TRIPLET_PCB_RING_METROLOGY)
PCB_BEING_POPULATED
PCB_POPULATION
  • Visual Inspection  (VISUAL_INSPECTION)
  • Component Position Check  (COMPONENT_POSITION_CHECK)
PCB_CUTTING
  • Quick Tab Cutting Inspection  (QUICK_TAB_CUTTING_INSPECTION)
QA_PRE_THERMAL_CYCLE
  • SLDO and precision resistors   (SLDO_RESISTORS)
  • NTC Verification  (NTC_VERIFICATION)
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology  (METROLOGY)
  • LV and HV Test  (HV_LV_TEST)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
QA_POST_THERMAL_CYCLE
  • NTC Verification  (NTC_VERIFICATION)
  • Via resistance  (VIA_RESISTANCE)
  • LV and HV Test  (HV_LV_TEST)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
QA_PRE_RADIATION_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology  (METROLOGY)
  • SLDO and precision resistors   (SLDO_RESISTORS)
  • NTC Verification  (NTC_VERIFICATION)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
  • LV and HV Test  (HV_LV_TEST)
QA_POST_RADIATION_POST_THERMAL_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
QA_POST_RADIATION_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
PCB_QC
  • LV and HV Test  (HV_LV_TEST)
  • Dowel Tolerance Check  (DOWEL_TOLERANCE_CHECK)
  • Quick Tab Cutting Inspection  (QUICK_TAB_CUTTING_INSPECTION)
UNHAPPY
PCB_READY_FOR_MODULE
PCB_RECEPTION_MODULE_SITE
  • Visual Inspection  (VISUAL_INSPECTION)
  • Mass  (MASS)
  • Metrology  (METROLOGY)
  • Metrology Triplet Linear  (TRIPLET_PCB_LINEAR_METROLOGY)
  • Metrology Triplet Ring  (TRIPLET_PCB_RING_METROLOGY)
MODULE/INIT
MODULE/ASSEMBLY
MODULE/WIREBONDING
MODULE/INITIAL_WARM
MODULE/QC_CROSSCHECK
MODULE/INITIAL_COLD
MODULE/PARYLENE_MASKING
MODULE/PARYLENE_COATING
MODULE/PARYLENE_UNMASKING
MODULE/POST_PARYLENE_WARM
MODULE/POST_PARYLENE_COLD
MODULE/WIREBOND_PROTECTION
MODULE/THERMAL_CYCLES
MODULE/LONG_TERM_STABILITY_TEST
MODULE/FINAL_WARM
MODULE/FINAL_COLD
MODULE/FINAL_METROLOGY
MODULE/QC_STATUS
MODULE/UNHAPPY
MODULE/NOTCONSIDEREDINYIELDS
MODULE/COMPLETE
MODULE/RECEPTION
MODULE/TAB_CUTTING
OB_LOADED_MODULE_CELL/INIT
OB_LOADED_MODULE_CELL/ASSEMBLY
OB_LOADED_MODULE_CELL/THERMAL_CYCLES
COMPLETE
OB_LOADED_MODULE_CELL/FINAL_WARM
OB_LOADED_MODULE_CELL/FINAL_COLD
OB_LOADED_MODULE_CELL/THERMAL_COLD
OB_LOADED_MODULE_CELL/THERMAL_WARM
OB_LOADED_MODULE_CELL/ENVELOPE_CHECK
OB_LOADED_MODULE_CELL/QC_STATUS
OB_LOADED_MODULE_CELL/UNHAPPY
OB_LOADED_MODULE_CELL/COMPLETE
OB_LOADED_MODULE_CELL/RECEPTION
OB_LOADED_MODULE_CELL/TAB_CUTTING
OB_LOADED_MODULE_CELL/PIGTAIL_INSERTION
Back to top page of this component