20UPGPQ2210493
Quad-PCB/Outer Pre-prod./NCAB-100um
  ITkPD Component Page Jump to ITkPD component page

Component Information

Item Value
Serial Number 20UPGPQ2210493
Production DB Component ID 367ae031a4271c8ccb6a74a36377f5b3
LocalDB Component ID 65f0e4adbb920b0035f65fca
Component Type module_pcb
Super-Component 20UPGM23210493
Sub-Components No match.
Flags

Properties

Item Data Type Value
PCB Manufacturer string NCAB
PCB design version codeTable 2
PCB vendor technology codeTable 2
SMD population vendor string Garner Osborne Circuits
PCB BOM version codeTable 12

Comments

Current Stage: Ranking of the module

No tests are allocated for this stage.


Past QC Stages and Results

  Stage: Final flatness measurement (MODULE/FINAL_METROLOGY) Complete

No tests are allocated for this stage.

  Stage: Final Cold (MODULE/FINAL_COLD) Complete

No tests are allocated for this stage.

  Stage: Final Warm (MODULE/FINAL_WARM) Complete

No tests are allocated for this stage.

  Stage: Long Term Stability Test (MODULE/LONG_TERM_STABILITY_TEST) Complete

No tests are allocated for this stage.

  Stage: Thermal Cycles (MODULE/THERMAL_CYCLES) Complete

No tests are allocated for this stage.

  Stage: Wirebond Protection (alt) (MODULE/WIREBOND_PROTECTION) Complete

No tests are allocated for this stage.

  Stage: Post-Parylene Cold (MODULE/POST_PARYLENE_COLD) Complete

No tests are allocated for this stage.

  Stage: Post-Parylene Warm (MODULE/POST_PARYLENE_WARM) Complete

No tests are allocated for this stage.

  Stage: Parylene Unmasking (MODULE/PARYLENE_UNMASKING) Complete

No tests are allocated for this stage.

  Stage: Parylene Coating (MODULE/PARYLENE_COATING) Complete

No tests are allocated for this stage.

  Stage: Parylene Masking (MODULE/PARYLENE_MASKING) Complete

No tests are allocated for this stage.

  Stage: Initial Cold (MODULE/INITIAL_COLD) Complete

No tests are allocated for this stage.

  Stage: QC cross-check (module swapping) (MODULE/QC_CROSSCHECK) Alternative

No tests are allocated for this stage.

  Stage: Initial Warm (MODULE/INITIAL_WARM) Complete

No tests are allocated for this stage.

  Stage: Wire Bonding (MODULE/WIREBONDING) Complete

No tests are allocated for this stage.

  Stage: Bare module to module PCB assembly (MODULE/ASSEMBLY) Complete

No tests are allocated for this stage.

  Stage: Initial state to associate flex to bare module (MODULE/INIT) Complete

No tests are allocated for this stage.

  Stage: PCB Reception at module site (PCB_RECEPTION_MODULE_SITE) Complete

Test Local Result ProdDB Record
Mass
(MASS)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Metrology
(METROLOGY)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Metrology Triplet Linear
(TRIPLET_PCB_LINEAR_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology Triplet Ring
(TRIPLET_PCB_RING_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: PCB ready for module (PCB_READY_FOR_MODULE) Complete

No tests are allocated for this stage.

  Stage: Test failed, needs investigation (UNHAPPY) Alternative

No tests are allocated for this stage.

  Stage: QC (PCB_QC) Complete

Test Local Result ProdDB Record
Dowel Tolerance Check
(DOWEL_TOLERANCE_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
LV and HV Test
(HV_LV_TEST)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Quick Tab Cutting Inspection
(QUICK_TAB_CUTTING_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA post radiation cycle (QA_POST_RADIATION_CYCLE) Alternative

Test Local Result ProdDB Record
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA post radiation post thermal cycle QC (QA_POST_RADIATION_POST_THERMAL_CYCLE) Alternative

Test Local Result ProdDB Record
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA pre-radiation cycle (QA_PRE_RADIATION_CYCLE) Alternative

Test Local Result ProdDB Record
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
SLDO and precision resistors
(SLDO_RESISTORS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Wirebond pull test
(WIREBOND_PULL_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA post-thermal cycle / thermal shock (QA_POST_THERMAL_CYCLE) Alternative

Test Local Result ProdDB Record
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Wirebond pull test
(WIREBOND_PULL_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QA pre-thermal cycle / thermal shock (QA_PRE_THERMAL_CYCLE) Alternative

Test Local Result ProdDB Record
LV and HV Test
(HV_LV_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
NTC Verification
(NTC_VERIFICATION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Signal Transmission
(SIGNAL_TRANSMISSION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
SLDO and precision resistors
(SLDO_RESISTORS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Wirebond pull test
(WIREBOND_PULL_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Cutting (PCB_CUTTING) Locally Signed Off

Test Local Result ProdDB Record
Quick Tab Cutting Inspection
(QUICK_TAB_CUTTING_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Population (PCB_POPULATION) Locally Signed Off

Test Local Result ProdDB Record
Component Position Check
(COMPONENT_POSITION_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: PCB being populated (PCB_BEING_POPULATED) Locally Signed Off

No tests are allocated for this stage.

  Stage: Reception (PCB_RECEPTION) Complete

Test Local Result ProdDB Record
Dowel Tolerance Check
(DOWEL_TOLERANCE_CHECK)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Image capture test
(IMAGE_CAPTURE_TEST)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Layer thickness measurement
(LAYER_THICKNESS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology
(METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology Triplet Linear
(TRIPLET_PCB_LINEAR_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Metrology Triplet Ring
(TRIPLET_PCB_RING_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Via resistance
(VIA_RESISTANCE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Bare PCB Initial (PCB_INIT) Locally Signed Off

No tests are allocated for this stage.

LocalDB Test ID Stage Test Name Inspector Date QC Registration
67111a3eeff9780043ae7418 PCB_RECEPTION_MODULE_SITE VISUAL_INSPECTION PaulMickael Chabrillat 2024-10-17 07:12:21 PDT(-0700) Selected
66fc2cafef991c0043c35e82 PCB_RECEPTION_MODULE_SITE METROLOGY PaulMickael Chabrillat 2024-10-01 10:09:03 PDT(-0700) Selected
66fc2c5ef081870042c49d65 PCB_RECEPTION_MODULE_SITE MASS PaulMickael Chabrillat 2024-10-01 10:07:42 PDT(-0700) Selected
66e12d3cc62de40043a3817d PCB_QC HV_LV_TEST FuatUstuner 2024-09-10 22:40:12 PDT(-0700) Selected
Stage Tests
PCB_INIT
PCB_RECEPTION
  • Visual Inspection  (VISUAL_INSPECTION)
  • Metrology  (METROLOGY)
  • Dowel Tolerance Check  (DOWEL_TOLERANCE_CHECK)
  • Layer thickness measurement  (LAYER_THICKNESS)
  • Image capture test  (IMAGE_CAPTURE_TEST)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology Triplet Linear  (TRIPLET_PCB_LINEAR_METROLOGY)
  • Metrology Triplet Ring  (TRIPLET_PCB_RING_METROLOGY)
PCB_BEING_POPULATED
PCB_POPULATION
  • Visual Inspection  (VISUAL_INSPECTION)
  • Component Position Check  (COMPONENT_POSITION_CHECK)
PCB_CUTTING
  • Quick Tab Cutting Inspection  (QUICK_TAB_CUTTING_INSPECTION)
QA_PRE_THERMAL_CYCLE
  • SLDO and precision resistors   (SLDO_RESISTORS)
  • NTC Verification  (NTC_VERIFICATION)
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology  (METROLOGY)
  • LV and HV Test  (HV_LV_TEST)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
QA_POST_THERMAL_CYCLE
  • NTC Verification  (NTC_VERIFICATION)
  • Via resistance  (VIA_RESISTANCE)
  • LV and HV Test  (HV_LV_TEST)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
QA_PRE_RADIATION_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
  • Metrology  (METROLOGY)
  • SLDO and precision resistors   (SLDO_RESISTORS)
  • NTC Verification  (NTC_VERIFICATION)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
  • LV and HV Test  (HV_LV_TEST)
QA_POST_RADIATION_POST_THERMAL_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
QA_POST_RADIATION_CYCLE
  • Signal Transmission  (SIGNAL_TRANSMISSION)
  • Via resistance  (VIA_RESISTANCE)
PCB_QC
  • LV and HV Test  (HV_LV_TEST)
  • Dowel Tolerance Check  (DOWEL_TOLERANCE_CHECK)
  • Quick Tab Cutting Inspection  (QUICK_TAB_CUTTING_INSPECTION)
UNHAPPY
PCB_READY_FOR_MODULE
PCB_RECEPTION_MODULE_SITE
  • Visual Inspection  (VISUAL_INSPECTION)
  • Mass  (MASS)
  • Metrology  (METROLOGY)
  • Metrology Triplet Linear  (TRIPLET_PCB_LINEAR_METROLOGY)
  • Metrology Triplet Ring  (TRIPLET_PCB_RING_METROLOGY)
MODULE/INIT
MODULE/ASSEMBLY
MODULE/WIREBONDING
MODULE/INITIAL_WARM
MODULE/QC_CROSSCHECK
MODULE/INITIAL_COLD
MODULE/PARYLENE_MASKING
MODULE/PARYLENE_COATING
MODULE/PARYLENE_UNMASKING
MODULE/POST_PARYLENE_WARM
MODULE/POST_PARYLENE_COLD
MODULE/WIREBOND_PROTECTION
MODULE/THERMAL_CYCLES
MODULE/LONG_TERM_STABILITY_TEST
MODULE/FINAL_WARM
MODULE/FINAL_COLD
MODULE/FINAL_METROLOGY
MODULE/QC_STATUS
MODULE/UNHAPPY
MODULE/NOTCONSIDEREDINYIELDS
MODULE/COMPLETE
MODULE/RECEPTION
MODULE/TAB_CUTTING
OB_LOADED_MODULE_CELL/INIT
OB_LOADED_MODULE_CELL/ASSEMBLY
OB_LOADED_MODULE_CELL/THERMAL_CYCLES
COMPLETE
OB_LOADED_MODULE_CELL/FINAL_WARM
OB_LOADED_MODULE_CELL/FINAL_COLD
OB_LOADED_MODULE_CELL/THERMAL_COLD
OB_LOADED_MODULE_CELL/THERMAL_WARM
OB_LOADED_MODULE_CELL/ENVELOPE_CHECK
OB_LOADED_MODULE_CELL/QC_STATUS
OB_LOADED_MODULE_CELL/UNHAPPY
OB_LOADED_MODULE_CELL/COMPLETE
OB_LOADED_MODULE_CELL/RECEPTION
OB_LOADED_MODULE_CELL/TAB_CUTTING
OB_LOADED_MODULE_CELL/PIGTAIL_INSERTION
Back to top page of this component