20UPGM22110576
Outer-Quad-Module/ITkPix_v1.1
  ITkPD Component Page Jump to ITkPD component page

Component Information

Item Value
Serial Number 20UPGM22110576
Production DB Component ID ed2e0f097f8ade22e3e0a5ac6110c439
LocalDB Component ID 64ef61e0c96c32004245fe1d
Component Type module
Super-Component No match.
Sub-Components No match.
Flags

Properties

Item Data Type Value
PCB-Bare Orientation isNormal boolean True
FE chip version codeTable 2
Wirebond protection roof presence boolean False
IREF Trim Bit FE1 integer None
IREF Trim Bit FE2 integer None
IREF Trim Bit FE3 integer None
IREF Trim Bit FE4 integer None

Comments

Current Stage: Long Term Stability Test

Test Type Local Result
Electrical Test (e-test) Module Summary
(E_SUMMARY)
No TestRun! TestRun is missing in LocalDB.
IV measurement
(IV_MEASURE)
No TestRun! TestRun is missing in LocalDB.

Candidate TestRuns of this Stage

LocalDB Object ID TestRun Code QC Passed Inspector Date Analysis Version QC Registration

Past QC Stages and Results

  Stage: Thermal Cycles (MODULE/THERMAL_CYCLES) Complete

Test Local Result ProdDB Record
Electrical Test (e-test) Module Summary
(E_SUMMARY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Flatness
(FLATNESS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
IV measurement
(IV_MEASURE)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Thermal Cycling
(THERMAL_CYCLING)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Wirebond Protection (alt) (MODULE/WIREBOND_PROTECTION) Complete

Test Local Result ProdDB Record
Electrical Test (e-test) Module Summary
(E_SUMMARY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
IV measurement
(IV_MEASURE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Mass Measurement
(MASS_MEASUREMENT)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Wire bonding protection roof envelope
(WP_ENVELOPE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: Post-Parylene Cold (MODULE/POST_PARYLENE_COLD) Complete

Test Local Result ProdDB Record
Electrical Test (e-test) Module Summary
(E_SUMMARY)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
IV measurement
(IV_MEASURE)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Post-Parylene Warm (MODULE/POST_PARYLENE_WARM) Complete

Test Local Result ProdDB Record
Electrical Test (e-test) Module Summary
(E_SUMMARY)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
IV measurement
(IV_MEASURE)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Parylene Unmasking (MODULE/PARYLENE_UNMASKING) Complete

Test Local Result ProdDB Record
Electrical Test (e-test) Module Summary
(E_SUMMARY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Flatness
(FLATNESS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
IV measurement
(IV_MEASURE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Parylene Coating (MODULE/PARYLENE_COATING) Complete

Test Local Result ProdDB Record
Parylene Properties
(PARYLENE)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Parylene Masking (MODULE/PARYLENE_MASKING) Complete

Test Local Result ProdDB Record
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Initial Cold (MODULE/INITIAL_COLD) Complete

Test Local Result ProdDB Record
Electrical Test (e-test) Module Summary
(E_SUMMARY)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
IV measurement
(IV_MEASURE)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.

  Stage: QC cross-check (module swapping) (MODULE/QC_CROSSCHECK) Not signed-off

No tests are allocated for this stage.

  Stage: Initial Warm (MODULE/INITIAL_WARM) Complete

Test Local Result ProdDB Record
Electrical Test (e-test) Module Summary
(E_SUMMARY)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
IV measurement
(IV_MEASURE)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Wire Bonding (MODULE/WIREBONDING) Complete

Test Local Result ProdDB Record
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Wirebond pull test
(WIREBOND_PULL_TEST)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Wirebonding Information
(WIREBONDING)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Bare module to module PCB assembly (MODULE/ASSEMBLY) Complete

Test Local Result ProdDB Record
Flatness
(FLATNESS)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Glue Information Module+Flex Attach
(GLUE_MODULE_FLEX_ATTACH)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Mass Measurement
(MASS_MEASUREMENT)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Quad Module Metrology
(QUAD_MODULE_METROLOGY)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!
Triplet Module Metrology
(TRIPLET_METROLOGY)
No result Test is missing in LocalDB.
N/A Test is not pushed to ITkPD.
Visual Inspection
(VISUAL_INSPECTION)
Registered Jump to the LocalDB Test Record!
Registered Jump to the ITkPD TestRun Page!

  Stage: Initial state to associate flex to bare module (MODULE/INIT) Not signed-off

No tests are allocated for this stage.

LocalDB Test ID Stage Test Name Inspector Date QC Registration
662a9410b70bfa9584e4d21f MODULE/THERMAL_CYCLES IV_MEASURE DoyeongKim 2024-05-03 17:44:36 PDT(-0700) Selected
662965e42ab1c10035cf0c9d MODULE/THERMAL_CYCLES VISUAL_INSPECTION DoyeongKim 2024-05-03 17:44:32 PDT(-0700) Selected
6614191ebb842d401fe650c3 MODULE/POST_PARYLENE_COLD IV_MEASURE DoyeongKim 2024-05-03 17:44:25 PDT(-0700) Selected
6634358cb70bfa9584e4fab1 MODULE/POST_PARYLENE_COLD E_SUMMARY DoyeongKim 2024-05-03 17:44:20 PDT(-0700) Selected
66108b6abb842d401fe650ba MODULE/POST_PARYLENE_WARM IV_MEASURE DoyeongKim 2024-05-02 16:00:43 PDT(-0700) Selected
662ae24bb70bfa9584e4db28 MODULE/POST_PARYLENE_WARM E_SUMMARY DoyeongKim 2024-05-02 16:00:38 PDT(-0700) Selected
6605ab2531eb120034d49b24 MODULE/PARYLENE_UNMASKING VISUAL_INSPECTION DoyeongKim 2024-04-25 11:05:49 PDT(-0700) Selected
6605a9a231eb120034d4992c MODULE/PARYLENE_COATING VISUAL_INSPECTION DoyeongKim 2024-04-25 09:48:03 PDT(-0700) Selected
6629650445c84000351ef152 MODULE/WIREBONDING VISUAL_INSPECTION TanviWamorkar 2024-04-25 09:30:16 PDT(-0700) Selected
662964b42ab1c10035cf0ae8 MODULE/ASSEMBLY VISUAL_INSPECTION TanviWamorkar 2024-04-25 09:27:39 PDT(-0700) Selected
66059fb4a450ce00352105bf MODULE/PARYLENE_COATING PARYLENE DoyeongKim 2024-04-19 13:41:41 PDT(-0700) Selected
6605a6bf31eb120034d4979c MODULE/PARYLENE_MASKING VISUAL_INSPECTION DoyeongKim 2024-04-19 13:37:05 PDT(-0700) Selected
65dcdfc381499052b7168d3f MODULE/INITIAL_COLD E_SUMMARY DoyeongKim 2024-04-02 12:03:18 PDT(-0700) Selected
65e0e38219748700343e8bdb MODULE/INITIAL_WARM IV_MEASURE JD 2024-02-29 12:05:22 PST(-0800) Selected
65c6b93b7bad964ffa69e1d9 MODULE/INITIAL_WARM E_SUMMARY Matias 2024-02-15 14:59:31 PST(-0800) Selected
64ef9b5bc96c3200424a65f5 MODULE/WIREBONDING WIREBOND_PULL_TEST DoyeongKim 2024-01-25 16:59:41 PST(-0800) Selected
64ef876dc96c3200424a0c5e MODULE/WIREBONDING WIREBONDING DoyeongKim 2024-01-25 16:59:39 PST(-0800) Selected
64ef644b9d1c7e0042bf316e MODULE/ASSEMBLY QUAD_MODULE_METROLOGY JD 2023-08-30 08:46:19 PDT(-0700) Selected
64ef63ac9d1c7e0042bf028f MODULE/ASSEMBLY MASS_MEASUREMENT JD 2023-08-30 08:43:40 PDT(-0700) Selected
Stage Tests
MODULE/INIT
MODULE/ASSEMBLY
  • Mass Measurement  (MASS_MEASUREMENT)
  • Glue Information Module+Flex Attach  (GLUE_MODULE_FLEX_ATTACH)
  • Triplet Module Metrology  (TRIPLET_METROLOGY)
  • Visual Inspection  (VISUAL_INSPECTION)
  • Flatness  (FLATNESS)
  • Quad Module Metrology  (QUAD_MODULE_METROLOGY)
MODULE/WIREBONDING
  • Wirebonding Information  (WIREBONDING)
  • Wirebond pull test  (WIREBOND_PULL_TEST)
  • Visual Inspection  (VISUAL_INSPECTION)
MODULE/INITIAL_WARM
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
MODULE/QC_CROSSCHECK
  • IV measurement  (IV_MEASURE)
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
MODULE/INITIAL_COLD
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
MODULE/PARYLENE_MASKING
  • Visual Inspection  (VISUAL_INSPECTION)
  • Parylene (de-)masking  (DE_MASKING)
MODULE/PARYLENE_COATING
  • Parylene Properties  (PARYLENE)
  • Visual Inspection  (VISUAL_INSPECTION)
MODULE/PARYLENE_UNMASKING
  • Flatness  (FLATNESS)
  • Visual Inspection  (VISUAL_INSPECTION)
  • IV measurement  (IV_MEASURE)
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • Parylene (de-)masking  (DE_MASKING)
MODULE/POST_PARYLENE_WARM
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
  • Visual Inspection  (VISUAL_INSPECTION)
MODULE/POST_PARYLENE_COLD
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
  • Visual Inspection  (VISUAL_INSPECTION)
MODULE/WIREBOND_PROTECTION
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • Wire bonding protection roof envelope  (WP_ENVELOPE)
  • Mass Measurement  (MASS_MEASUREMENT)
  • Visual Inspection  (VISUAL_INSPECTION)
  • IV measurement  (IV_MEASURE)
MODULE/THERMAL_CYCLES
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • Thermal Cycling  (THERMAL_CYCLING)
  • Flatness  (FLATNESS)
  • Visual Inspection  (VISUAL_INSPECTION)
  • IV measurement  (IV_MEASURE)
MODULE/LONG_TERM_STABILITY_TEST
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
  • Longterm stability DCS  (LONG_TERM_STABILITY_DCS)
MODULE/FINAL_WARM
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
  • Visual Inspection  (VISUAL_INSPECTION)
MODULE/FINAL_COLD
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
  • Visual Inspection  (VISUAL_INSPECTION)
MODULE/FINAL_METROLOGY
  • Flatness  (FLATNESS)
MODULE/QC_STATUS
  • Module ranking  (RANKING)
MODULE/UNHAPPY
MODULE/NOTCONSIDEREDINYIELDS
MODULE/COMPLETE
MODULE/RECEPTION
  • Visual Inspection  (VISUAL_INSPECTION)
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
MODULE/TAB_CUTTING
  • Mass Measurement  (MASS_MEASUREMENT)
  • Module PCB Tab Cutting Information  (CUTTER_PCB_TAB)
  • Visual Inspection  (VISUAL_INSPECTION)
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
OB_LOADED_MODULE_CELL/INIT
OB_LOADED_MODULE_CELL/ASSEMBLY
OB_LOADED_MODULE_CELL/THERMAL_CYCLES
OB_LOADED_MODULE_CELL/FINAL_WARM
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
OB_LOADED_MODULE_CELL/FINAL_COLD
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
OB_LOADED_MODULE_CELL/THERMAL_COLD
  • Thermal Measure  (THERMAL_PERFORMANCE)
OB_LOADED_MODULE_CELL/THERMAL_WARM
  • Thermal Measure  (THERMAL_PERFORMANCE)
OB_LOADED_MODULE_CELL/ENVELOPE_CHECK
OB_LOADED_MODULE_CELL/QC_STATUS
OB_LOADED_MODULE_CELL/UNHAPPY
OB_LOADED_MODULE_CELL/COMPLETE
OB_LOADED_MODULE_CELL/RECEPTION
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
OB_LOADED_MODULE_CELL/TAB_CUTTING
  • Electrical Test (e-test) Module Summary  (E_SUMMARY)
  • IV measurement  (IV_MEASURE)
  • Module PCB Tab Cutting Information  (CUTTER_PCB_TAB)
OB_LOADED_MODULE_CELL/PIGTAIL_INSERTION
Back to top page of this component